Project Overview

Truck Parking Lot Construction & Site Development. A client approached us in September looking to construct a trailer overflow lot for a nearby tenant by January 2022. The challenge was transforming a fully wooded lot into a completed truck lot while battling the unpredictable fall and winter weather along with ongoing supply chain issues. The strategy was to review and plan every activity prior to construction, and prepare for any possible challenge that may be thrown our way.

Truck parking lot construction on Circle Drive in Piscataway, NJ turned a fully wooded property into a functioning trailer overflow lot. The client needed the lot ready for a nearby tenant within just a few months, and Pillari finished it two weeks ahead of schedule.

A Tight Deadline

The client came to Pillari in September with a clear goal: a working trailer lot by January. That meant clearing, building and finishing the entire site through fall and winter. Weather at that time of year is hard to predict, and ongoing supply chain issues were making some materials slow to arrive.

Planning Every Step

Pillari’s approach started well before the first tree came down. The team reviewed and planned every activity ahead of construction, preparing for any challenge that might come up along the way.

Building in Sections

To keep the work moving, the job was divided into sections. Each section could be built and completed on its own, even while other areas waited for long-lead materials. A delay in one part of the site didn’t hold up the rest.

Multiple crews worked separately but in sync, each focused on its own area while moving toward the same finish line. That coordination turned a demanding schedule into a manageable one.

The Result

The lot was completed two weeks ahead of schedule, with minimal changes to the plans. The tenant got the trailer parking it needed, on time and without surprises.

This project shows what careful planning and well-coordinated crews can do. Even on a tight timeline, in tough weather, good industrial site development comes down to preparation and teamwork. Check out the Circle project time-lapse video below to see the transformation.

Project Details

LOCATION:

Circle Drive, Piscataway, Middlesex County, NJ

CLIENT:

Private Developer

SERVICES RENDERED:

Site Preparation / Clearing & Grubbing
Mass Earthwork & Grading
Erosion & Sediment Control
Storm Drainage Systems
Asphalt Paving
Concrete Curbs / Sidewalks

CONTRACT PRICE:

$240,042

STATUS:

Completed

Project Gallery

CIRCLE DRIVE

Earthwork & grading begins at Circle Drive Trailer Overflow Lot

CIRCLE DRIVE TRAILER

Circle Drive Trailer Overflow Lot is beginning to take shape

Circle Drive Trailer Overflow Lot

Circle Drive trailer overflow lot mass earthwork and grading

before-4 (1)

Circle Drive Trailer Overflow Lot transformation is almost complete.

Tell Us About Your Project